I. environmental requirements:
1, to achieve the customer's environmental management, material content standards, to avoid pollution of the environment and human health. 2, to ensure better continuous operation and development of the company.
Two. Precautions before operation:
1. charging typhoon machine running normally, charging platform without debris, power voltage indication in 380V + 10% can turn on. 2., pull out strength switch must be shut down, discharge can be carried on, strictly prohibit live operation. 3. work shutdown without discharge
4. after discharge, the machine is not allowed to start again. The power supply must be powered again after the power failure. The machine is allowed to start. Only the magnetizing voltage is above 1.2KV to magnetize
Three. Operation content:
1. turn on the power switch (including earth switch), the power indicator light and the power voltmeter show the power supply voltage. 2. press the power on button, the magnetizing indicator light and the magnetizing voltmeter show the magnetizing voltage
3. put the magnetized object into the charging head, press the charged object with a special bar, press the foot switch OK., remove the articles with good magnetism from the mold, and put them into the plastic basin or board to separate the filled articles
Four. Quality requirements and notes: 1., the magnetic inverse or stents can not be deformed. 2., do not have charged and charged magnets mixed
3. the height of the magnetized column is lower than that of the table 2CM. (TV horn magnetizer for production line)